lucid.page Print-Farm Filament Batch Acceptance Record
Text size
Read time2 min

# Print-Farm Filament Batch Acceptance Record

Prepared by the FilamentBay Materials Team

Contents

Complete this record before distributing incoming spools across a farm. Define what can be released and which evidence supports that decision. This worksheet does not specify a certified sampling plan; the process owner must choose sample count and spool selection according to the consequences of failure.

Receiving record/date: __________ Approver: __________

Traceability Entry
Supplier and purchase reference __________
Grade, color, nominal diameter and spool identifiers __________
Stated lot code, or explicitly absent __________
Packaging condition and photographs __________
Documents received and exact grade/SKU/lot covered __________

Keep missing information visible. A shipment date is not a substitute for a supplier lot code, and documentation for another grade cannot release this batch. Separate mixed or untraceable material until its scope is resolved.

Choose a retained reference with a known label, storage history and approved project. Record conditioning for both reference and incoming material, including the schedule actually used and exposure afterward. Otherwise, different moisture histories may confound the comparison.

Planned check Acceptance basis agreed beforehand Observation/evidence
Label and purchase specification __________ __________
Diameter spot readings and method __________ __________
Color under named lighting/reference __________ __________
Representative fit or function __________ __________
Feeding and preparation consistency __________ __________

Reference project, printer, nozzle and inspection tool: __________

Sample selection and count: __________

Use equivalent printer condition, orientation and inspection methods for reference and incoming prints. If an adjustment is necessary, record it explicitly and decide whether it needs separate qualification rather than silently tuning away a difference. Retain failed samples and the relevant project alongside accepted evidence.

Disposition: release identified scope / quarantine / request clarification: __________

Released spool identifiers and record location: __________

Failed criterion, supplier question and follow-up owner: __________

A few diameter readings do not establish an entire spool’s distribution or a shipment defect rate. Release only the scope supported by the agreed checks; an attractive factory photograph or a cost estimate cannot replace that evidence.

Source: FilamentBay’s new-batch qualification checklist.

End